Synthesis Gas & Derivatives Projects
Methanol Plant (Train II &III)
Description:
IHI E&C engineered and constructed two methanol plants (Plant II & III) for Methanex Chile Ltd. in Punta Arenas, Chile. Plant II was designed for a methanol production capacity of 2,700 metric tonnes per day (MTPD) and Plant III for 3,000 MTPD.
Highlights:
• Two world scale methanol plants at remote location
• Scope included basic design, detailed design, procurement , construction and start-up assistance
• Lump-sum EPC contracts
• Projects executed from IHI E&C’s office in Houston, TX, U.S.A.
• Global procurement
• Innovative logistics to minimize shipping cost
• Contract award to performance test: 25 months
Gas to Liquids (GTL) Test Facility
Description:
IHI E&C engineered and constructed a grass roots Gas-to-Liquids (GTL) test facility for BP Exploration (Alaska) Inc. in Nikiski, Alaska. The test facility was built to demonstrate a new technology for syngas generation combined with an improved process for converting syngas to 300 barrels per day of syncrude.
Highlights:
• Demonstration of a new syngas generation technology named “Compact Reforming” owned by Davy Process Technology and BP
• Remote location, severe winter weather
• Commercial size Compact Reformer
• Modular design
• Scope included site selection, detailed design, procurement, construction, commissioning and start-up services
• Large tents were utilized to allow concrete foundation installation during severe winter weather leading to improved schedule
• Projects executed from IHI E&C’s office in Houston, TX, U.S.A.
• Duration: 28 months